HS2 in Camden

Camden will be home to the new HS2 London terminus at Euston Station.

Within Camden a new tunnel will take HS2 trains in and out of Euston Station, with Granby Terrace and Hampstead Road bridges being lengthened to accommodate the new high-speed railway. Four tunnel shafts will be built at Granby Terrace, Euston Cavern, Park Village East and Adelaide Road.

Work is already well underway, with more than a thousand people at work on sites around London.

Latest information on HS2 in Camden

Update following Government announcement on HS2

In line with Government direction, work to construct the HS2 station at Euston was paused on 9 March 2023 due to inflationary pressure and the need to find a more affordable design. A copy of the Transport Secretary’s statement is available online here.

On 4 October 2023, the Government announced that it would be redirecting funding from HS2 to other transport projects around the country but restated its commitment to completing Phase 1 of HS2 between Birmingham and London, with a rescoped Euston station. The Government will appoint a development company, separate from HS2 Ltd, to manage the delivery of Euston Station and the wider development.

Whilst options for the delivery of Euston are explored, HS2 Ltd continues to complete enabling works across the HS2 site and other activities to make the sites safe while the main construction work is paused. Some work between Euston and Old Oak Common will also be rephased along with other sections of the HS2 project. Please find below more details about the works at the Euston station, Euston Approaches and Adelaide Road Headhouse and Ventilation Shaft sites.

We apologise for any disruption caused by the pause in HS2 works in Camden and we are working to minimise impacts as far as possible.

Where we can safely, we will remove any temporary road and bus stop closures and move hoarding lines to reduce the impact on the community. We are also opening up parts of the site not currently needed for construction for temporary community use.

In July 2023 we opened a temporary garden at the National Temperance Hospital site on Hampstead Road. Further spaces will be opened, following engagement with the community, throughout 2024. Further information about temporary uses can be found here.

Find out more about our works in the area

Euston Station's new taxi rank

Euston station’s new taxi rank opened on Sunday 7 April 2024. The taxi rank has been constructed by HS2’s station construction partner, Mace Dragados joint venture (MDjv), as part of the works to enable a future HS2 terminus whilst keeping taxis in full operation.

The new taxi rank is located at the front of the bus station, adjacent to Eversholt Street and Euston Road, in the former Euston Square Gardens East. The 36 space rank is for black cabs only and features a new passenger help point, improved wayfinding to the station, as well as 120 new cycle spaces and upgraded overhead canopies.

For passengers requiring mobility assistance, the Assisted Travel Lounge services will remain in their current location in Euston Square Gardens West. Staff will be on hand in both locations to provide directions and assistance. Private hire vehicles can continue to drop off only in Euston Square Gardens West.

The current rank will be decommissioned and become a temporary public garden with new planting, seating areas and a walking route through to the station. The garden will remain until the area is required for construction of a future HS2 terminus. Find out more about temporary uses at Euston here.

Utility works in Euston and Euston Approaches area

Whilst options for the delivery of Euston are explored following the Government’s Network North announcement, HS2 Ltd continues to complete enabling works across the HS2 site to prepare for a future station and HS2 terminus. This includes some utility works around Euston Station, and on Hampstead Road and Regents Park Estate.

These works are being carried out by HS2 construction partners – Skanska, Costain, Strabag (SCSJV) and Mace Dragados (MDJV) joint ventures.

Mace Dragados (MDJV) works:

MDJV works in progress include a programme of essential utility diversion work around the Euston station creating a new utilities corridor.

Skanska, Costain, Strabag (SCSJV) works:

SCSJV need to temporarily divert existing utilities on Hampstead Road before extending Hampstead Road bridge. Once the bridge is extended, the utilities on Hampstead Road will be permanently reinstalled.

We work closely with our contractors to ensure that all works are co-ordinated and clearly communicated, with the aim of reducing impacts on residents and maintaining access for the general public at all times.

Please see below the links to information outlining utility works carried out by HS2 Construction Partners – MDJV and SCSJV:

Utility works in Euston and Euston Approaches area

Air quality management in Camden

Air quality is affected by construction in several ways: by exhaust fumes of construction vehicles and effects from road closures and diversions making some roads busier. 

HS2 will seek to reduce traffic impact to the local community through a range of considerations and will monitor air quality in the wider area around Euston. 

Efforts to reduce traffic impacts: 

  • HS2 have strict emissions criteria requirements for engines of contractors’ vehicles. 
  • HS2 have set emissions criteria requirements for the engines of non-road mobile machinery e.g., excavators, large cranes and piling machines. 
  • Establishing a traffic liaison group including HS2, Camden Council and emergency services. 
  • Using designated lorry routes on A roads where possible and minimising the use of local roads. 
  • Routes for large goods vehicles must be approved by Camden Council where there are more than 24 large goods vehicle movements per day to or from a compound. 
  • Producing Local Traffic Management Plans with Camden Council, TfL and emergency services before the start of work. 
  • Requiring lorry drivers to be trained in reducing emissions, as part of their ongoing Certificate of Professional Competency training while on the project. 
  • Requiring construction vehicles to use a booking management system, to smooth flow of traffic and avoid construction vehicles queuing on the road. 

How are we going to measure air quality? 

High Speed Two (HS2) Ltd and its Contractors are required to undertake air quality and dust monitoring, and produce monthly reports, to comply with the Code of Construction Practice (CoCP).  

These reports present the monthly air quality monitoring undertaken each month for HS2 within local authorities along the Phase One Route. 

The reports contain monitoring data and interpretative results and include a summary of the construction activities occurring; any complaints received; the data recorded over the monitoring period; any periods in exceedance of agreed trigger levels; the results of any investigations; and where the HS2 works have been found to be the source, any action taken to resolve the issue and to prevent a recurrence.  

In Camden, we are monitoring nitrogen dioxide at 67 locations using diffusion tubes. Air quality monitoring began in summer 2016 to establish a baseline and will continue during construction for as long as it is necessary to manage significant effects. 

Indicative measurements of construction dust (as particulate matter PM10) using continuous monitors is being used to manage dust during construction and ensure appropriate mitigation is in place. 

Noise insulation in Camden

The construction work for HS2 is likely to create noise and vibration that will affect some residents living near worksites. 

We will design and construct HS2 in ways that reduce noise as much as we reasonably can. In certain circumstances, where construction noise from HS2 is still likely to affect you in your home, we may offer to install noise insulation for you, or pay for you to install it yourself. 

We are surveying listed buildings around Euston, to prepare for consent applications. These additional consents are only required for listed buildings – those protected by law because of their heritage or architectural interest. 

Find out more

Trees in Camden

HS2 works in Camden have impacted trees in various locations including St James’s Gardens, Euston Square Gardens, and numerous roads within the borough. We recognise that many of the trees that we need to remove are established mature trees which cannot be fully replaced.

We understand the importance of trees to residents in Camden and will use all reasonable endeavours to reduce impacts on them where possible, and to retain trees in the borough. This includes planning construction works so that we can retain trees for as long as possible and providing replacement trees to help mitigate for the loss of each tree removed as a result of HS2 works.

During the select committee process an assurance was given to Camden Council that HS2 Ltd would fund Camden Council to plant replacement trees in appropriate locations in the borough. The full terms of the assurance is available on the register of Undertakings and Assurances on the government’s website here.

To help mitigate the initial loss of trees related to the project, to date, HS2 has funded Camden Council to plant 138 replacement trees. Full details of the London Borough of Camden’s tree planting project is available on their website here. Here is a map of trees planted on Camden Council land to date.

HS2 Ltd has established the Camden Tree Panel. The Tree Panel is responsible for reviewing and challenging the removal of, and works to, any tree in the London Borough of Camden undertaken by HS2 Ltd.’s contractors. No trees shall be removed, or have works done to them, unless they have been reviewed and accepted by the Tree Panel.

Below is a list of the outcomes from Tree Panel meetings from June 2022 where works to trees or tree removals have been agreed. If you’re interested in looking at the outcomes of a Tree Panel meeting held before the ones listed below, please contact our Helpdesk.

Camden Tree Panel engagement activities

Construction noise and vibration monitoring monthly reports

These reports present the monthly construction noise and vibration monitoring undertaken each month for HS2 within local authorities along the Phase One route.  

The reports contain monitoring data and interpretative results and include a summary of the construction activities occurring; any complaints received; the data recorded over the monitoring period; any periods in exceedance of agreed trigger levels; the results of any investigations; and where the HS2 works have been found to be the source, any action taken to resolve the issue and to prevent a recurrence. 

Find out more

Special cases

We recognise that there may be circumstances in which residents are more sensitive to construction noise. In such circumstances specific noise trigger levels and/or alternative noise control measures will be considered on a case-by-case basis to protect residents. Some situations that might require alternative measures include: 

  • Residential homes where noise insulation is not a viable option;  
  • Night workers;  
  • People who regularly work from home and need a quiet environment; and  
  • Those that may have a medical condition which will be seriously aggravated by construction noise.  

If you think the above may apply to you, please contact our Helpdesk in the first instance. To progress your application, we may need certain additional information from you, for example evidence that you work from home regularly or medical evidence from your doctor. We will handle all confidential information you provide to us sensitively and securely and in accordance with all relevant legislation and we will only hold it for the time required to progress your case. 

What we're delivering in Camden

Euston Station

Euston Station

Euston will be the London terminus station for HS2, bringing services to the heart of the capital.

Euston Approaches

Euston Approaches

Our Euston Approaches is the section of track that will connect the Euston Tunnel South Portal to Euston Station.

Euston Portal Headhouse

Euston Portal Headhouse

The Euston Portal Headhouse will provide emergency access to for the Euston Approaches.

Euston Cavern Headhouse

Euston Cavern Headhouse

The Euston Cavern Headhouse will provide emergency access to for the Euston Approaches.

Traction Substation (TSS)

Traction Substation (TSS)

The TSS will enable the relocation of equipment needed to provide services and ventilation for the safe operation of the Northern Line.

Plans for Maria Fidelis School

Plans for Maria Fidelis School

Plans to create a temporary site office and welfare facility on the former Maria Fidelis school site were approved in 2021.

Temporary uses at Euston

Temporary uses at Euston

Working through The Euston Partnership (TEP), we are collaborating across partners to develop ideas and identify temporary use projects.

The Euston Partnership

The Euston Partnership

The Partnership brings together the projects alongside key stakeholders, providing a single guiding mind for the entire Euston area.

Euston Tunnel

Euston Tunnel

Euston Tunnel will carry passengers between London Euston Station and Old Oak Common Station on the HS2 network.

Adelaide Road Headhouse and Ventilation Shaft

Adelaide Road Headhouse and Ventilation Shaft

Adelaide Road is located in the London Borough of Camden, between Chalk Farm and Primrose Hill Road.

Explore the In Your Area Map

Archaeology

Archaeology

The map displays information about our archaeological sites along the route.

Green Corridor

Green Corridor

The map displays information about our environmental sites along the route.

HS2 funded projects

HS2 funded projects

The map displays information about our funded community and business projects along the route.

Keeping you informed about our works

Stay informed by the works

Stay informed by the works

Find information about HS2 works and activities taking place in your area.

Managing impacts of construction

Managing impacts of construction

Find out information about how we manage construction impacts.

Construction look ahead and newsletters

Construction look ahead and newsletters

Read our three-month look ahead and newsletters for associated work in Camden.

Recent work in your area

Name
Location
Estimated Start Date
Estimated End Date
Hampstead Road, Robert Street, Stanhope Street, Varndell Street
01/02/2024
30/04/2025
Camden, Hampstead Road, Harrington Square, Harrington Street, Mornington Crescent, Mornington Terrace, Park Village East, Parkway, Prince Albert Road, Regent's Park Estate, Stanhope Street
27/08/2021
31/12/2026
Camden
18/04/2024
19/04/2024
Adelaide Road
16/04/2024
16/04/2024

Community engagement in Camden

The Euston Community Representatives Group (ECRG) meets to discuss proposals for the planned construction of HS2’s terminus station in Euston.

Find out more

Keep informed

  • Construction work notices

    If you would like email updates about HS2 construction works in your area, and how it may impact you

    Sign up here

  • Contact us

    If you contact the Helpdesk our Community Engagement Advisors will try to answer your questions straight away.

    Contact us